mooring prep:
. inspected chain and cleaned as much of it as I could
. replaced and upgraded the shackles and tackle hardware which attached chain to mooring ball and penants
. added a swivel to chain below all tackle which I could attach a safety line which went to mast
. added a 2nd penant, and added chafing gear
boat prep:
. took sail off boom and put in rear berth
. took boom off mast
. filled fuel tank
. filled water tank
. put mast in straight postions forward and aft
. attached jack line wires to forward pulpit rails
. tightened back stays
. attached main halyard to traveler for main sheet, centered and tightened
. removed as much windage as possible from decks
. tightened all hatches
. tied tiller to center
Result:
during storm est wind 30-50 mph the boat was tacking hard on the mooring sailing until penant pulled bow through a tack. interesting to watch concidering all other sailboats where staying straight into the wind. the boat came out with no issues or damage and very happy with resutl
No comments:
Post a Comment