what I have found:
1. I have moved the existing water holding tank to the port side and will use for waste storage
2. I have used a rectangle plastic holding tank mounted vertically below the sink for fresh water
after a rough layout I'm happy with the new locations, and will be working on hose layout and fitment.
next for me is to reinstall the head and finish the repair to the head encloser and mounting.
No comments:
Post a Comment