Here is my rough list of things to get done before the start of the sailing season in may, I expect this to change but feel a good basic list is important to keep this moving forward.
List:
1. remove and reseat all through hole fittings on hull
2. remove and reseat prop shaft support, and fair into hull
3. service prop shaft seal through hull
4. repair and install all parts to make the 'head' work properly with holding tank
5. reseat all windows, vents and hatchs on boat
6. reseat all hardware and hand rails (inspect for rottan core)
7. reinstall fuse panel with very basic elec, with elec diagram: nav lights, engine, radio, 12v charge station, instruments
8. strip undercoating and repaint
9. service all blocks, and travelers
10. repair chips on mast
11. repair SS ring for bearing on mast
12. repair bottom of mast to except bearing
13. paint all wood in hatches to seal